Acting as a subcontractor for Budimex, we participated in the modernization of Kostrzyńska Street which is crucial for urban public transport in Gorzów Wielkopolski. All the works carried out by our company as part of this investment included the construction of a new track system.
The value of the works carried out in the period from 1 August 2018 to 26 April 2019 amounted to more than PLN 7.2 million (gross).
Discover our
partners’
opinions on our delivery
The task included:
-
Installation of prefabricated track slabs including filling the gaps between the slabs;
-
Installation of a tram track made of Ri60N rails using the embedded rail system, on concrete substructure with a point grout and anchoring, and on pre-stressed concrete and wooden sleepers with tamping;
-
Installation of nine one-track single tram turnouts with trailing switch drives, on a concrete substructure with a point grout and anchoring;
-
Installation of double track crossings on a concrete substructure with a point grout with anchoring;
-
Performing 60R2/49E1 and 49E1/S42 transition welds;
-
Installation of eight expansion joints;
-
Installation of linear drainage.
Place
of investment
Quality Policy:
From the very moment the company was founded, quality has been our focus. This approach guarantees due performance of construction projects, transparent and rational
conduct of business processes, and safety for our employees and associates. Read more