Modernization of the Katowice – Rondo junction

Modernization of the Katowice – Rondo junction

Raniżów

We carried out an investment task in the “design and build” formula entitled: “Modernization of the Katowice – Rondo junction” for Tramwaje Śląskie S.A.

The total value of the investment task amounted to nearly PLN 7.7 million (gross) and the entire project was carried out in two stages: stage I between 25 June and 16 November 2018; and stage II between 14 June and 30 August 2019.

Discover our

partners’

opinions on our delivery

 

Tramwaje Śląskie S.A. hereby certifies that the works under the said contract were executed in a proper manner, in accordance with the Contract and the provisions of the construction law and were properly completed. 

Bolesław Jerzy Knapik President of the Board Tramwaje Śląskie S.A. 

24 April 2020 tram project 

Fortum Silesia S.A. confirms that KZN RAIL (...) performed the task entitled: Alteration of the tram track along Wolności Street in Zabrze, together with the necessary rearrangements (...) The works were done properly. 

Kamila Zybura-Pluta Attorney of Fortum Silesia SA 

1 February 2019 tram infrastructure

Fortum Silesia S.A. confirms that the works under the said contract were executed in a proper manner, in accordance with the Contract and the rules of good building practice and were properly completed.

Fortum Silesia S.A., Andrzej Bąk -

29 January 2019

All the works were executed in accordance with good building practice and in good quality. The company demonstrated professionalism, punctuality and diligence.

Piotra Szatkowski - Technical Director

27 April 2022

The works were carried out with high diligence and professionalism in the comprehensive implementation of the commissioned task, in accordance with technical knowledge, applicable standards and regulations.

Eugeniusz Kołodyński- Project Director

12 September 2022

Tormel Sp. z o.o. hereby certifies that the works under the subject Contract were carried out properly, on time, in accordance with the Contract, the principles of good construction practice, and were duly completed.

Katarzyna Szram-  President of the Management Board
31.10.2024

Tormel Sp. z o.o. hereby certifies that the works under the aforementioned Contract were carried out properly, on time, in accordance with the Contract, good construction practices, and were duly completed.

The scope of the task included:

  • Preparation of design documentation and obtaining administrative decisions enabling the implementation of construction works.
  • Modernization of the tram track with a total length of 660.6 meters of single track, including: demolition of the old permanent way, construction of a classic base of ballast on sleepers along with the construction of the ballast substructure and track tamping, installation of three road-tramway crossings using prefabricated track slabs
  • Delivery and installation of three complete double-track single turnouts on wooden switch sleepers, together with the construction of a ballast layer and turnout tamping, along with point machines, as well as heating and drainage systems.
  • Installation of expansion joints and rail lubrication devices with lubrication points.
  • Tram track drainage.
  • Topsoiling and grass sowing.

Place

of investment

Show all realizations

Quality Policy:

From the very moment the company was founded, quality has been our focus. This approach guarantees due performance of construction projects, transparent and rational

conduct of business processes, and safety for our employees and associates. Read more

Quality Policy:

Strona korzysta z plików cookies w celu realizacji usług zgodnie z Polityką Cookies . Wszelkie warunki przychowywania oraz dostępu do plików cookie ustawiane są z poziomu Twojej przeglądarki.