KZN Rail Sp. z o.o.desktop 2 KZN Rail Sp. z o.o.mobile 2

Warszawa

Renovation of the tram tracks and tram stop platforms at Zawisza Square in Warsaw.

Renovation of the tram tracks and tram stop platforms at Zawisza Square in Warsaw.

Warszawa

Renovation of the Tram Tracks and Tram Stop Platforms at Zawisza Square in Warsaw

As part of the project "Renovation of the Tram Tracks and Tram Stop Platforms at Zawisza Square in Warsaw," KZN Rail Sp. z o.o. carried out comprehensive tram track and road construction works for Warsaw Trams.

The main reconstruction works at the junction were completed in three phases between 7 July and 10 August 2025. The use of an innovative technology based on large-format precast concrete slabs manufactured by KZN Contrack reduced the traffic closure period to just five weeks. By comparison, conventional cast-in-place concrete technology would have required a closure of at least three months.

Scope of Works

Tram Track Works (total length: 748 track metres)

  • Removal of the existing tram tracks – 748 track metres
  • Replacement of the track substructure – 2,262 m²
  • Installation of large-format precast turnout slabs – 797.2 m²
  • Installation of large-format precast track slabs – 786.3 m²
  • Construction of ballastless tram track – 636 track metres
  • Construction of ballasted tram track – 112 track metres
  • Installation of tram turnouts – 4 sets
  • Installation of rail lubrication systems – 4 sets
  • Replacement of the turnout control and heating systems – 4 sets
  • Restoration of asphalt pavement adjacent to the tram tracks – 323.2 m²
  • Construction of the tram track drainage system

Tram Stop Platform Works

  • Installation of new protective safety barriers – 171 linear metres
  • Renovation of three tram stop platforms: Zawisza Square 05, 06 and 08

Pedestrian and Cycle Infrastructure

  • Preparation of design documentation for the replacement of pedestrian and cycleway surfaces
  • Renovation of pedestrian walkways at each approach to the junction
  • Renovation of the cycle path on the Grójecka Street approach
  • Supply and placement of topsoil for newly constructed green areas

Discover our

partners’

opinions on our delivery

 

The services were completed on time and in accordance with the terms of the contract.

Konrad Marek Niklewicz- Member of the Management Board

3 February 2026

Place

of investment

Show all realizations

Quality Policy:

From the very moment the company was founded, quality has been our focus. This approach guarantees due performance of construction projects, transparent and rational

conduct of business processes, and safety for our employees and associates. Read more

Quality Policy:

This website uses cookies to provide services in accordance with the Cookie Policy . Cookie storage and access settings can be managed in your browser.