At the entrance to the Borek Tram Depot in Wrocław, we performed the following works for the General Contractor – “Zakład Sieci i Zasilania sp. z o.o.” from Wrocław:
- installation of track made of 60R2 R260 rails and 60R2 R290 rails on a continuous grout, along with adjustment and anchoring – 94 meters of single track.
- installation of turnouts on a continuous grout with adjustment and anchoring – 224 meters of single track.
- delivery of a one-track single turnout – 1 set
- delivery of a double-track single semi-turnout – 1 set
- delivery of a one-track single diamond crossing – 2 sets