Between 16 September 2013 and 29 November 2013 we performed a task for the Dolnośląskie Przedsiębiorstwo Napraw Infrastruktury Komunikacyjnej “DOLKOM”. The total value of works amounted to PLN 1,770,000.
The scope of the works included:
- replacement of permanent way on sleepers (including inserts, transition rails) – 522 meters of single track,
- comprehensive replacement of turnouts (including the subballast, ballast and drainage – 5 sets (including 1 ST),
- replacement of all CBP slabs on a category A level crossing, along with asphalt pavement at the crossing.