“Design and execution of works for the alteration of three engineering objects: a bridge at km 0.346; a viaduct at km 0.654; and a bridge at km 1.824 of the no. 286 railway line Kłodzko Główne – Wałbrzych Główny, as part of the project entitled: “Improving the technical condition of engineering objects – Stage II””
Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system
Railway turnouts:
- R500 - 2 sets
- R190 - 1 set
We delivered all three sets to Kłodzko Główne station in two transports
Delivery date: October 2022 – August 2023