We completed the delivery as part of the project "Major Track Renewal, Including Associated Works, on Railway Line No. 36, Track No. 1 (km 18.828–25.299), Railway Line No. 29, Track No. 1 (km 1.100–50.580), and Railway Line No. 10, Track No. 1 (km 16.600–35.400)."
The scope of work included the delivery and unloading of a railway turnout pre-assembled in block sections using SWITCHER technology and the PWP gantry crane system.
As part of the project, we delivered:
- 1 × R500 turnout, pre-assembled in block sections.
Delivery completion date: 15 April 2025.