The tram route to the Nicolaus Copernicus University in Toruń was performed in the period between 17 April 2013 and 31 May 2014. The total value of the works amounted to nearly PLN 15 million.
Discover our
partners’
opinions on our delivery
The scope of works included:
- installation of tracks and turnouts on a continuous grout,
- installation of base of ballast, turnouts and crossings on sleepers,
- installation of tracks using a continuous rail fixing system with flexible lining.