As part of the investment task entitled “Track, catenary and accompanying infrastructure modernization at the Chebzie terminus in Ruda Śląska – stage II” performed in cooperation with “NJN” Damian Kłosek, KZN Rail Sp. z o.o. performed alteration works of the track system, including:
– execution of approximately 670 meters of ballasted track on pre-stressed concrete sleepers, together with laying a ballast bed of 31,5–50 railroad ballast and final profiling with the same aggregate;
– installation of approximately 80 meters of single track using the point grout technology, along with the execution of cast-in-place concrete subgrade slabs and final profiling;
– installation of 9 turnouts, 2 track connections and 7 sets of expansion joints on a classic base of ballast on SPT-06 type pre-stressed concrete switch sleepers;
– installation of 5 turnouts and 2 track crossings using point grout technology;
– installation of 1 turnout in prefabricated slabs using Contrack technology.
The works were carried out between 7 February 2024 and 5 May 2024.
The value of the works amounted to PLN 6 368 000,00.
Place
of investment
Quality Policy:
From the very moment the company was founded, quality has been our focus. This approach guarantees due performance of construction projects, transparent and rational
conduct of business processes, and safety for our employees and associates. Read more





