- A specialized equipment system designed to tackle the most difficult prefabricated rail infrastructure installation works.
- The primary purpose of the system is to ensure efficient unloading and precise placement of turnout blocks at the installation site.
- The system allows to pick up turnout construction from wagons with tiltable platforms, for example SWITCHER, other wagons, vehicles or assembly tables;
and ensures short-distance transport to the final infrastructure component installation site. - As the system is extremely versatile and mobile, entire track sections and elements of engineering objects may be unloaded and transported; it also facilitates similar specialized works on the tramway network.
- Modern and durable gantry system design enables seamless handling of loads even in excess of forty tons.

|
High |
|
PWP gantry system allows longitudinal and lateral unloading
Longitudinal unloading Lateral unloading

Recommended PWP gantries applications:
-
one-track lines
-
double-track lines
-
stations
-
station systems – also without laid tracks
-
passing sidings
-
bridges
-
tunnels
See how this system works
Have any questions? Contact us
Selected realizations

Radom
Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons
Works carried out under the task “Alteration of the track system of the Radom Wschodni station through the installation of new turnouts and the alteration of railway equipment” Delivery and unloading of turnouts in blocks u...

Rusiec
Delivery and unloading of turnouts: Switcher - LOT C
Project name: “Design and execution of construction works on the no. 131 railway line, C area (Kalina – Rusiec Łódzki)” Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system&...

Garbatka-Letnisko
Delivery and unloading of turnouts: Garbatka-Letnisko Switcher
Task: Maintenance works on the territory of the Railway Track Unit in Skarżysko-Kamienna Delivery and unloading of a turnout in blocks using SWITCHER wagons and PWP gantry system Railway turnouts: - RKPD SB - 1 set&nb...
Huta Komorowska
Majdan Krolewski
Execution of delivery and unloading as part of the task Design and execution of works for the construction of a passing siding in Majdan Królewski, as part of the project entitled “Works on the no. 71 railway line Ocice – Rzesz&oac...



