KZN Rail Sp. z o.o.desktop 2 KZN Rail Sp. z o.o.mobile 2

PWP gantries

  • A specialized equipment system designed to tackle the most difficult prefabricated rail infrastructure installation works.
  • The primary purpose of the system is to ensure efficient unloading and precise placement of turnout blocks at the installation site.
  • The system allows to pick up turnout construction from wagons with tiltable platforms, for example SWITCHER, other wagons, vehicles or assembly tables;
    and ensures short-distance transport to the final infrastructure component installation site.
  • As the system is extremely versatile and mobile, entire track sections and elements of engineering objects may be unloaded and transported; it also facilitates similar specialized works on the tramway network.
  • Modern and durable gantry system design enables seamless handling of loads even in excess of forty tons.

 

 

 

 

High
system
mobility!

  • On-site system mobilization within up to 24 hours after sending the order
  • Can be transported on platform wagons
  • Can be transported on truck trailers
  • No additional unloading equipment is necessary, the system offers self-unloading capacity

 

LEARN MORE

 

PWP gantry system allows longitudinal and lateral unloading

 

          

                                  Longitudinal unloading                                                                                                             Lateral unloading

 

 

Recommended PWP gantries applications:

  • one-track lines 

  • double-track lines 

  • stations 

  • station systems – also without laid tracks 

  • passing sidings 

  • bridges 

  • tunnels 

 

See how this system works

Have any questions? Contact us


Selected realizations

Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons  Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons  Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons 
Radom
Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons 

Works carried out under the task “Alteration of the track system of the Radom Wschodni station through the installation of new turnouts and the alteration of railway equipment”    Delivery and unloading of turnouts in blocks u...

Delivery and unloading of turnouts: Switcher - LOT C  Delivery and unloading of turnouts: Switcher - LOT C  Delivery and unloading of turnouts: Switcher - LOT C 
Rusiec
Delivery and unloading of turnouts: Switcher - LOT C 

Project name: “Design and execution of construction works on the no. 131 railway line, C area (Kalina – Rusiec Łódzki)”    Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system&...

Delivery and unloading of turnouts: Garbatka-Letnisko Switcher  Delivery and unloading of turnouts: Garbatka-Letnisko Switcher  Delivery and unloading of turnouts: Garbatka-Letnisko Switcher 
Garbatka-Letnisko
Delivery and unloading of turnouts: Garbatka-Letnisko Switcher 

Task: Maintenance works on the territory of the Railway Track Unit in Skarżysko-Kamienna  Delivery and unloading of a turnout in blocks using SWITCHER wagons and PWP gantry system  Railway turnouts:   - RKPD SB - 1 set&nb...

Majdan Krolewski  Majdan Krolewski 
Huta Komorowska
Majdan Krolewski 

Execution of delivery and unloading as part of the task Design and execution of works for the construction of a passing siding in Majdan Królewski, as part of the project entitled “Works on the no. 71 railway line Ocice – Rzesz&oac...

Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons  Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons  Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons 
Radom
Delivery and unloading of turnouts to Radom Wschodni using Switcher wagons 

Works carried out under the task “Alteration of the track system of the Radom Wschodni station through the installation of new turnouts and the alteration of railway equipment”    Delivery and unloading of turnouts in blocks u...

Delivery and unloading of turnouts: Switcher - LOT C  Delivery and unloading of turnouts: Switcher - LOT C  Delivery and unloading of turnouts: Switcher - LOT C 
Rusiec
Delivery and unloading of turnouts: Switcher - LOT C 

Project name: “Design and execution of construction works on the no. 131 railway line, C area (Kalina – Rusiec Łódzki)”    Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system&...

Delivery and unloading of turnouts: Garbatka-Letnisko Switcher  Delivery and unloading of turnouts: Garbatka-Letnisko Switcher  Delivery and unloading of turnouts: Garbatka-Letnisko Switcher 
Garbatka-Letnisko
Delivery and unloading of turnouts: Garbatka-Letnisko Switcher 

Task: Maintenance works on the territory of the Railway Track Unit in Skarżysko-Kamienna  Delivery and unloading of a turnout in blocks using SWITCHER wagons and PWP gantry system  Railway turnouts:   - RKPD SB - 1 set&nb...

Majdan Krolewski  Majdan Krolewski 
Huta Komorowska
Majdan Krolewski 

Execution of delivery and unloading as part of the task Design and execution of works for the construction of a passing siding in Majdan Królewski, as part of the project entitled “Works on the no. 71 railway line Ocice – Rzesz&oac...

Strona korzysta z plików cookies w celu realizacji usług zgodnie z Polityką Cookies . Wszelkie warunki przychowywania oraz dostępu do plików cookie ustawiane są z poziomu Twojej przeglądarki.