Turnout logistics

SWITCHER – A COMPREHENSIVE TURNOUT LOGISTICS SYSTEM

 

Our innovative Switcher logistics system is the best choice for optimizing railway turnouts logistics. It ensures that pre-assembled turnouts, which offer the ultimate initial quality, arrive directly at the installation site. The cornerstone of the system consists of specialized wagons with tiltable platforms, allowing fully assembled oversize turnout blocks while to be transported without exceeding the transport gauge.

 

Features of the Switcher system:

  • control and optimization of turnout logistics management – just in time;
  • high initial quality, securing extended durability and lower costs of turnout maintenance throughout their life cycle;
  • operational security;
  • limited duration of train traffic interruptions on renovated stations/lines.

 

See how the Switcher works

Have any questions? Contact us


Selected realizations

Works on the E75 line in the Czyżew – Białystok section  Works on the E75 line in the Czyżew – Białystok section  Works on the E75 line in the Czyżew – Białystok section 
Białystok
Works on the E75 line in the Czyżew – Białystok section 

Currently, turnouts are being delivered as part of the task “Works on the E75 line in the Czyżew – Bialystok section”.  Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system and railroad c...

LOT A - Works on the 131 railway line in the Chorzów Batory (km 5,900) – Nakło Śląskie (km 29,000) section  LOT A - Works on the 131 railway line in the Chorzów Batory (km 5,900) – Nakło Śląskie (km 29,000) section  LOT A - Works on the 131 railway line in the Chorzów Batory (km 5,900) – Nakło Śląskie (km 29,000) section 
Chorzów
LOT A - Works on the 131 railway line in the Chorzów Batory (km 5,900) – Nakło Śląskie (km 29,000) section 

Deliveries of turnouts are underway as part of the “LOT A – Works on the 131 railway line in the Chorzów Batory (km 5.900) – Nakło Śląskie (km 29.000) section” task.    Delivery and unloading of turnouts...

Delivery and unloading of turnouts to Gdynia Port using Switcher wagons  Delivery and unloading of turnouts to Gdynia Port using Switcher wagons  Delivery and unloading of turnouts to Gdynia Port using Switcher wagons 
Gdynia
Delivery and unloading of turnouts to Gdynia Port using Switcher wagons 

Construction works at Gdynia Port station as part of the project “Improving railway access to the sea port in Gdynia”    Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system   ...

Delivery and unloading of turnouts to Bełchów using Switcher wagons  Delivery and unloading of turnouts to Bełchów using Switcher wagons  Delivery and unloading of turnouts to Bełchów using Switcher wagons 
Stachlew
Delivery and unloading of turnouts to Bełchów using Switcher wagons 

Works on the C-E 20 railway line in Łowicz Główny – Skierniewice section   Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system:  Railway turnouts:   - R500 - 6 sets&...

Delivery and unloading of turnouts to Kłodzko Główne using Switcher wagons  Delivery and unloading of turnouts to Kłodzko Główne using Switcher wagons  Delivery and unloading of turnouts to Kłodzko Główne using Switcher wagons 
Kłodzko
Delivery and unloading of turnouts to Kłodzko Główne using Switcher wagons 

“Design and execution of works for the alteration of three engineering objects: a bridge at km 0.346; a viaduct at km 0.654; and a bridge at km 1.824 of the no. 286 railway line Kłodzko Główne – Wałbrzych Główny, as part of...

Delivery and unloading of turnouts using Switcher wagons to Suburban Agglomeration Railway Rzeszów – Jasionka  Delivery and unloading of turnouts using Switcher wagons to Suburban Agglomeration Railway Rzeszów – Jasionka  Delivery and unloading of turnouts using Switcher wagons to Suburban Agglomeration Railway Rzeszów – Jasionka 
Lutoryż
Delivery and unloading of turnouts using Switcher wagons to Suburban Agglomeration Railway Rzeszów – Jasionka 

“DESIGN AND EXECUTION OF WORKS AS PART OF THE TASK ENITLED: Construction and modernization of railway lines and stop infrastructure EXECUTED UNDER THE PROJECT “Construction of Suburban Agglomeration Railway””   ...

Supply of turnouts to Ełk using Switcher wagons  Supply of turnouts to Ełk using Switcher wagons 
Ełk
Supply of turnouts to Ełk using Switcher wagons 

Works on the E 75 line in the Białystok – Suwałki – Trakiszki (state border) section, stage I section Białystok – Ełk    Delivery of turnouts in blocks on SWITCHER wagons:    Railway turnouts:  - R1200...

Delivery and unloading of turnouts: Switcher - E59 Wronki-Krzyż  Delivery and unloading of turnouts: Switcher - E59 Wronki-Krzyż  Delivery and unloading of turnouts: Switcher - E59 Wronki-Krzyż 
Wronki
Delivery and unloading of turnouts: Switcher - E59 Wronki-Krzyż 

Works on the E59 railway line in the Wronki – Słonice section    Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system    Railway turnouts:  - R1200 - 4 sets  - R500 - 18 s...

Delivery of high speed turnouts using Switcher wagons (Zeltweg – Plichowice)  Delivery of high speed turnouts using Switcher wagons (Zeltweg – Plichowice) 
Żarnów
Delivery of high speed turnouts using Switcher wagons (Zeltweg – Plichowice) 

Modern high-speed turnouts transported from Austria by Switcher special wagons have arrived on the Central Trunk Line. The structures were delivered to Pilichowice, where a few months earlier the turnouts had been damaged in an accident. The unloadin...

Supply of turnouts to Warszawa Zachodnia using Switcher wagons  Supply of turnouts to Warszawa Zachodnia using Switcher wagons 
Warszawa
Supply of turnouts to Warszawa Zachodnia using Switcher wagons 

Works on the Warsaw cross-city line in the Warszawa Wschodnia – Warszawa Zachodnia section    Delivery of turnouts in blocks on SWITCHER wagons:    Railway turnouts:  - R1200 - 7 sets  - R760 - 10 sets ...

Supply of turnouts to Warszawa Wawer using Switcher wagons  Supply of turnouts to Warszawa Wawer using Switcher wagons  Supply of turnouts to Warszawa Wawer using Switcher wagons 
Warszawa
Supply of turnouts to Warszawa Wawer using Switcher wagons 

Works on the no. 7 railway line Warszawa Wschodnia Osobowa – Dorohusk in the Warszawa – Otwock – Dęblin – Lublin section, stage II    Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gant...

Skawina Skawina
Skawina
Skawina

Execution of delivery and unloading of turnouts as part of the task “Preparation of design documentation and execution of construction works in the Kraków Płaszów – Podbory Skawińskie section under the task entitled: “...

Miedźno  Miedźno 
Miedźno
Miedźno 

Execution of delivery and unloading of turnouts as part of the task “LOT C - Works on the no. 131, 686, 687, 704 railway lines in the Kalina (km 66,800) - Rusiec Łódzki (km 137,500) section” 

Wręczyca  Wręczyca 
Wręczyca
Wręczyca 

Execution of delivery and unloading of turnouts as part of the task “LOT C - Works on the no. 131, 686, 687, 704 railway lines in the Kalina (km 66,800) - Rusiec Łódzki (km 137,500) section” 

Ozorków  Ozorków 
Ozorków
Ozorków 

Execution of delivery and unloading of turnouts as part of the task “Revitalization of the no. 16 railway line Łódź Widzew – Kutno in the Zgierz – Ozorków section” 

Nowe Herby  Nowe Herby 
Herby
Nowe Herby 

Execution of delivery and unloading of turnouts as part of the task “LOT C - Works on the no. 131, 686, 687, 704 railway lines in the Kalina (km 66,800) - Rusiec Łódzki (km 137,500) section”    

Łęczyca  Łęczyca 
Łęczyca
Łęczyca 

Execution of delivery and unloading of turnouts as part of the task “Revitalization of the no. 16 railway line Łódź Widzew – Kutno in the Zgierz – Ozorków section” 

Czechowice-Dziedzice  Czechowice-Dziedzice 
Czechowice-Dziedzice
Czechowice-Dziedzice 

Execution of delivery and unloading of turnouts as part of the task “Execution of construction works and preparing a detailed design and execution of construction works for the installation of control command and signaling devices, railway tele...

Kraków Bonarka  Kraków Bonarka 
Kraków
Kraków Bonarka 

Execution of delivery and unloading of turnouts as part of the task “Preparation of design documentation and execution of construction works in the Kraków Płaszów – Podbory Skawińskie section under the task entitled: “...

Podbory Skawińskie  Podbory Skawińskie 
Skawina
Podbory Skawińskie 

Execution of delivery and unloading of turnouts as part of the task “Preparation of design documentation and execution of construction works in the Kraków Płaszów – Podbory Skawińskie section under the task entitled: “...

Mielec  Mielec 
Mielec
Mielec 

Execution of delivery and unloading of turnouts as part of the task “Revitalization of the no. 25 railway line in the Padew – Mielec – Dębica section” 

Wolbrom  Wolbrom 
Wolbrom
Wolbrom 

Execution of delivery and unloading of turnouts as part of the task ‘Works on the no. 62, 660 railway lines in the Tunel – Bukowno – Sosnowiec Płd. section” 

Juliusz – Kozioł - line 171  Juliusz – Kozioł - line 171 
Dąbrowa Górnicza
Juliusz – Kozioł - line 171 

Execution of delivery and unloading of four sets of double slips as part of the task “Revitalization of the no. 171 railway line in the Kozioł junction signal box - Juliusz siding post section under the investment project entitled: “Work...

Nowa Sarzyna  Nowa Sarzyna 
Nowa Sarzyna
Nowa Sarzyna 

Execution of delivery, unloading and installation of four sets of double slips as part of the task “Modernization of the Nowa Sarzyna station” under the project entitled: “Improving safety and eliminating operational hazards on the...

Słotwiny  Słotwiny 
Słotwiny
Słotwiny 

Execution of delivery and unloading of a R500 turnout for the task Design and execution of construction works for the investment task entitled: “Works on the no. 22 and 25 railway lines in the Gałkówek – Tomaszów Maz. &ndash...

Czarnca-Włoszczowa Czarnca-Włoszczowa
Czarnca-Włoszczowa

Execution of delivery, unloading and installation of six sets of R1200 turnouts as part of the task Design and execution of construction works as part of the task entitled “Construction of the no. 582 railway line Czarnca – Włoszczowa Płn...

Kanie Kanie
Kanie-Stacja
Kanie

Execution of delivery and unloading of four sets of R300 turnouts as part of the task “Alteration of the Kanie passing siding on the no. 7 Warszawa Wschodnia Osobowa – Dorohusk railway line” as part of the project WORKS ON THE NO. 7...

Rejowiec Fabryczny Rejowiec Fabryczny
Rejowiec Fabryczny
Rejowiec Fabryczny

Execution of delivery and unloading of a R500 turnout for the task Design and execution of works for the task entitled: Works on the no. 7 line Warszawa Wschodnia Osobowa – Dorohusk in the Lublin – Dorohusk section and the construction of...

Piaseczno Piaseczno
Zagorzyce
Piaseczno

Loading, logistics and unloading of R500 turnout at the construction site carried out as part of the task “Development of a building permit design and detailed design and execution of LOT B works in the “Design and Build’ formula un...

Delivery of a 250 km/h turnout for the Central Trunk Line Delivery of a 250 km/h turnout for the Central Trunk Line
Psary
Delivery of a 250 km/h turnout for the Central Trunk Line

Transport and unloading at the Psary station of a high-speed (250 km/h) turnout structure equipped with a complete and integrated system for actuating and controlling the movable parts of the SNA-1 turnout.

Turnout block logistics – Łódź Railway Junction Turnout block logistics – Łódź Railway Junction
Zgierz
Turnout block logistics – Łódź Railway Junction

Deliveries and unloading of turnouts for the Łódź Railway Junction performed for ZRK DOM Poznań, executing the contract under the task “Works on the no. 15, 16 railway lines in the Łódź Kaliska – Zgierz – Kutno section...

Szczecin Gumieńce – delivery of turnouts in blocks Szczecin Gumieńce – delivery of turnouts in blocks
Szczecin Gumieńce – delivery of turnouts in blocks

The task was completed for Zakład Robót Komunikacyjnych - DOM w Poznaniu as part of the task entitled: “Design and execution of construction works for the alteration of the track system at the Szczecin Gumieńce station in the Gm1 control...

Works on the E75 line in the Czyżew – Białystok section  Works on the E75 line in the Czyżew – Białystok section  Works on the E75 line in the Czyżew – Białystok section 
Białystok
Works on the E75 line in the Czyżew – Białystok section 

Currently, turnouts are being delivered as part of the task “Works on the E75 line in the Czyżew – Bialystok section”.  Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system and railroad c...

LOT A - Works on the 131 railway line in the Chorzów Batory (km 5,900) – Nakło Śląskie (km 29,000) section  LOT A - Works on the 131 railway line in the Chorzów Batory (km 5,900) – Nakło Śląskie (km 29,000) section  LOT A - Works on the 131 railway line in the Chorzów Batory (km 5,900) – Nakło Śląskie (km 29,000) section 
Chorzów
LOT A - Works on the 131 railway line in the Chorzów Batory (km 5,900) – Nakło Śląskie (km 29,000) section 

Deliveries of turnouts are underway as part of the “LOT A – Works on the 131 railway line in the Chorzów Batory (km 5.900) – Nakło Śląskie (km 29.000) section” task.    Delivery and unloading of turnouts...

Delivery and unloading of turnouts to Gdynia Port using Switcher wagons  Delivery and unloading of turnouts to Gdynia Port using Switcher wagons  Delivery and unloading of turnouts to Gdynia Port using Switcher wagons 
Gdynia
Delivery and unloading of turnouts to Gdynia Port using Switcher wagons 

Construction works at Gdynia Port station as part of the project “Improving railway access to the sea port in Gdynia”    Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system   ...

Delivery and unloading of turnouts to Bełchów using Switcher wagons  Delivery and unloading of turnouts to Bełchów using Switcher wagons  Delivery and unloading of turnouts to Bełchów using Switcher wagons 
Stachlew
Delivery and unloading of turnouts to Bełchów using Switcher wagons 

Works on the C-E 20 railway line in Łowicz Główny – Skierniewice section   Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system:  Railway turnouts:   - R500 - 6 sets&...

Delivery and unloading of turnouts to Kłodzko Główne using Switcher wagons  Delivery and unloading of turnouts to Kłodzko Główne using Switcher wagons  Delivery and unloading of turnouts to Kłodzko Główne using Switcher wagons 
Kłodzko
Delivery and unloading of turnouts to Kłodzko Główne using Switcher wagons 

“Design and execution of works for the alteration of three engineering objects: a bridge at km 0.346; a viaduct at km 0.654; and a bridge at km 1.824 of the no. 286 railway line Kłodzko Główne – Wałbrzych Główny, as part of...

Delivery and unloading of turnouts using Switcher wagons to Suburban Agglomeration Railway Rzeszów – Jasionka  Delivery and unloading of turnouts using Switcher wagons to Suburban Agglomeration Railway Rzeszów – Jasionka  Delivery and unloading of turnouts using Switcher wagons to Suburban Agglomeration Railway Rzeszów – Jasionka 
Lutoryż
Delivery and unloading of turnouts using Switcher wagons to Suburban Agglomeration Railway Rzeszów – Jasionka 

“DESIGN AND EXECUTION OF WORKS AS PART OF THE TASK ENITLED: Construction and modernization of railway lines and stop infrastructure EXECUTED UNDER THE PROJECT “Construction of Suburban Agglomeration Railway””   ...

Supply of turnouts to Ełk using Switcher wagons  Supply of turnouts to Ełk using Switcher wagons 
Ełk
Supply of turnouts to Ełk using Switcher wagons 

Works on the E 75 line in the Białystok – Suwałki – Trakiszki (state border) section, stage I section Białystok – Ełk    Delivery of turnouts in blocks on SWITCHER wagons:    Railway turnouts:  - R1200...

Delivery and unloading of turnouts: Switcher - E59 Wronki-Krzyż  Delivery and unloading of turnouts: Switcher - E59 Wronki-Krzyż  Delivery and unloading of turnouts: Switcher - E59 Wronki-Krzyż 
Wronki
Delivery and unloading of turnouts: Switcher - E59 Wronki-Krzyż 

Works on the E59 railway line in the Wronki – Słonice section    Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gantry system    Railway turnouts:  - R1200 - 4 sets  - R500 - 18 s...

Delivery of high speed turnouts using Switcher wagons (Zeltweg – Plichowice)  Delivery of high speed turnouts using Switcher wagons (Zeltweg – Plichowice) 
Żarnów
Delivery of high speed turnouts using Switcher wagons (Zeltweg – Plichowice) 

Modern high-speed turnouts transported from Austria by Switcher special wagons have arrived on the Central Trunk Line. The structures were delivered to Pilichowice, where a few months earlier the turnouts had been damaged in an accident. The unloadin...

Supply of turnouts to Warszawa Zachodnia using Switcher wagons  Supply of turnouts to Warszawa Zachodnia using Switcher wagons 
Warszawa
Supply of turnouts to Warszawa Zachodnia using Switcher wagons 

Works on the Warsaw cross-city line in the Warszawa Wschodnia – Warszawa Zachodnia section    Delivery of turnouts in blocks on SWITCHER wagons:    Railway turnouts:  - R1200 - 7 sets  - R760 - 10 sets ...

Supply of turnouts to Warszawa Wawer using Switcher wagons  Supply of turnouts to Warszawa Wawer using Switcher wagons  Supply of turnouts to Warszawa Wawer using Switcher wagons 
Warszawa
Supply of turnouts to Warszawa Wawer using Switcher wagons 

Works on the no. 7 railway line Warszawa Wschodnia Osobowa – Dorohusk in the Warszawa – Otwock – Dęblin – Lublin section, stage II    Delivery and unloading of turnouts in blocks using SWITCHER technology, PWP gant...

Skawina Skawina
Skawina
Skawina

Execution of delivery and unloading of turnouts as part of the task “Preparation of design documentation and execution of construction works in the Kraków Płaszów – Podbory Skawińskie section under the task entitled: “...

Miedźno  Miedźno 
Miedźno
Miedźno 

Execution of delivery and unloading of turnouts as part of the task “LOT C - Works on the no. 131, 686, 687, 704 railway lines in the Kalina (km 66,800) - Rusiec Łódzki (km 137,500) section” 

Wręczyca  Wręczyca 
Wręczyca
Wręczyca 

Execution of delivery and unloading of turnouts as part of the task “LOT C - Works on the no. 131, 686, 687, 704 railway lines in the Kalina (km 66,800) - Rusiec Łódzki (km 137,500) section” 

Ozorków  Ozorków 
Ozorków
Ozorków 

Execution of delivery and unloading of turnouts as part of the task “Revitalization of the no. 16 railway line Łódź Widzew – Kutno in the Zgierz – Ozorków section” 

Nowe Herby  Nowe Herby 
Herby
Nowe Herby 

Execution of delivery and unloading of turnouts as part of the task “LOT C - Works on the no. 131, 686, 687, 704 railway lines in the Kalina (km 66,800) - Rusiec Łódzki (km 137,500) section”    

Łęczyca  Łęczyca 
Łęczyca
Łęczyca 

Execution of delivery and unloading of turnouts as part of the task “Revitalization of the no. 16 railway line Łódź Widzew – Kutno in the Zgierz – Ozorków section” 

Czechowice-Dziedzice  Czechowice-Dziedzice 
Czechowice-Dziedzice
Czechowice-Dziedzice 

Execution of delivery and unloading of turnouts as part of the task “Execution of construction works and preparing a detailed design and execution of construction works for the installation of control command and signaling devices, railway tele...

Kraków Bonarka  Kraków Bonarka 
Kraków
Kraków Bonarka 

Execution of delivery and unloading of turnouts as part of the task “Preparation of design documentation and execution of construction works in the Kraków Płaszów – Podbory Skawińskie section under the task entitled: “...

Podbory Skawińskie  Podbory Skawińskie 
Skawina
Podbory Skawińskie 

Execution of delivery and unloading of turnouts as part of the task “Preparation of design documentation and execution of construction works in the Kraków Płaszów – Podbory Skawińskie section under the task entitled: “...

Mielec  Mielec 
Mielec
Mielec 

Execution of delivery and unloading of turnouts as part of the task “Revitalization of the no. 25 railway line in the Padew – Mielec – Dębica section” 

Wolbrom  Wolbrom 
Wolbrom
Wolbrom 

Execution of delivery and unloading of turnouts as part of the task ‘Works on the no. 62, 660 railway lines in the Tunel – Bukowno – Sosnowiec Płd. section” 

Juliusz – Kozioł - line 171  Juliusz – Kozioł - line 171 
Dąbrowa Górnicza
Juliusz – Kozioł - line 171 

Execution of delivery and unloading of four sets of double slips as part of the task “Revitalization of the no. 171 railway line in the Kozioł junction signal box - Juliusz siding post section under the investment project entitled: “Work...

Nowa Sarzyna  Nowa Sarzyna 
Nowa Sarzyna
Nowa Sarzyna 

Execution of delivery, unloading and installation of four sets of double slips as part of the task “Modernization of the Nowa Sarzyna station” under the project entitled: “Improving safety and eliminating operational hazards on the...

Słotwiny  Słotwiny 
Słotwiny
Słotwiny 

Execution of delivery and unloading of a R500 turnout for the task Design and execution of construction works for the investment task entitled: “Works on the no. 22 and 25 railway lines in the Gałkówek – Tomaszów Maz. &ndash...

Czarnca-Włoszczowa Czarnca-Włoszczowa
Czarnca-Włoszczowa

Execution of delivery, unloading and installation of six sets of R1200 turnouts as part of the task Design and execution of construction works as part of the task entitled “Construction of the no. 582 railway line Czarnca – Włoszczowa Płn...

Kanie Kanie
Kanie-Stacja
Kanie

Execution of delivery and unloading of four sets of R300 turnouts as part of the task “Alteration of the Kanie passing siding on the no. 7 Warszawa Wschodnia Osobowa – Dorohusk railway line” as part of the project WORKS ON THE NO. 7...

Rejowiec Fabryczny Rejowiec Fabryczny
Rejowiec Fabryczny
Rejowiec Fabryczny

Execution of delivery and unloading of a R500 turnout for the task Design and execution of works for the task entitled: Works on the no. 7 line Warszawa Wschodnia Osobowa – Dorohusk in the Lublin – Dorohusk section and the construction of...

Piaseczno Piaseczno
Zagorzyce
Piaseczno

Loading, logistics and unloading of R500 turnout at the construction site carried out as part of the task “Development of a building permit design and detailed design and execution of LOT B works in the “Design and Build’ formula un...

Delivery of a 250 km/h turnout for the Central Trunk Line Delivery of a 250 km/h turnout for the Central Trunk Line
Psary
Delivery of a 250 km/h turnout for the Central Trunk Line

Transport and unloading at the Psary station of a high-speed (250 km/h) turnout structure equipped with a complete and integrated system for actuating and controlling the movable parts of the SNA-1 turnout.

Turnout block logistics – Łódź Railway Junction Turnout block logistics – Łódź Railway Junction
Zgierz
Turnout block logistics – Łódź Railway Junction

Deliveries and unloading of turnouts for the Łódź Railway Junction performed for ZRK DOM Poznań, executing the contract under the task “Works on the no. 15, 16 railway lines in the Łódź Kaliska – Zgierz – Kutno section...

Szczecin Gumieńce – delivery of turnouts in blocks Szczecin Gumieńce – delivery of turnouts in blocks
Szczecin Gumieńce – delivery of turnouts in blocks

The task was completed for Zakład Robót Komunikacyjnych - DOM w Poznaniu as part of the task entitled: “Design and execution of construction works for the alteration of the track system at the Szczecin Gumieńce station in the Gm1 control...

Strona korzysta z plików cookies w celu realizacji usług zgodnie z Polityką Cookies . Wszelkie warunki przychowywania oraz dostępu do plików cookie ustawiane są z poziomu Twojej przeglądarki.